公共卫生间隔断安装施工的10个步骤

来源:http://www.jnndjc.com 日期:2022-10-19 发布人:ningda


一些公众卫生间为了打造一个干净卫生、环保、方便的环境,在设计安装时用木板,抗倍特板等一系列的隔断材料将卫生间隔断拆分成成一个个的小空间,卫生间隔断怎么安装施工?接下来济南卫生间隔断厂家为大家总结了隔断的10个步骤,一起来看看吧。
In order to create a clean, hygienic, environment-friendly and convenient environment, some public toilets use a series of partition materials such as wood boards and anti magnification boards to divide the toilet partitions into small spaces. How to install the toilet partitions? Next, Jinan bathroom partition manufacturer summarized the 10 steps of partition, let's have a look.
1.了解卫生隔断效果的整体布置和配件的配置位置。一般公共卫生隔断由杠杆、侧栏板、门板、拉手、锁、中柱板、鞋底、转角、中间板、观光板等配件和板材组成。一般公厕的隔断安装都是在卫生间装修时安装。不管是网上买的还是实体店买的,都会安装打包或者交一定的安装费帮你安装。下面对公共卫生间隔断的安装方法进行详细说明,以及卫生间隔断的安装流程。
1. Understand the overall layout of sanitary partition effect and the configuration position of accessories. The general public health partition is composed of lever, side fence, door panel, handle, lock, central column plate, sole, corner, intermediate plate, sightseeing plate and other accessories and plates. Generally, the partition of public toilets is installed when the toilet is decorated. Whether you buy it online or in a physical store, you will install and package it or pay a certain installation fee to help you install it. The installation method of public toilet partition is described in detail below, as well as the installation process of toilet partition.
2.画一条线找到卫生间隔断的安装位置,根据卫生间隔断的大小用线标出安装位置。如上图所示,卫生间规划的位置根据具体卫生间隔断的整体安装工程确定。根据配件的实际情况,画出脚座的角码和安装位置线(注意与中间隔板连接的角码,上下各偏移5mm,避免两个螺丝接触在一起;此外,在计算尺寸时,需要注意侧板应覆盖透明板。
2. Draw a line to find the installation position of the toilet partition, and mark the installation position with a line according to the size of the toilet partition. As shown in the above figure, the planned location of the toilet is determined according to the overall installation of the specific toilet partition. According to the actual situation of the accessories, draw the corner code and the installation position line of the foot base (pay attention to the corner code connected with the middle partition, which is offset by 5mm from top to bottom to avoid two screws contacting each other; in addition, when calculating the size, it is necessary to note that the side plate should be covered with a transparent plate.
3.用角码安装中柱,中间隔板、侧柱和观察板,并在相应位置安装脚座。请注意,当中柱与中间隔板连接时,同一位置的两个角码应上下偏移5毫米,以防止角码螺钉碰撞。安装脚踏板时,脚踏板应先放在地板上,脚踏板与柱板边缘的距离应根据柱板的宽度比确定。然后将整个搁脚板直接安装在柱板上,一个搁脚板用于侧柱板,两个搁脚板用于中间柱板。
3. Install the center pillar, the middle partition, the side pillar and the observation plate with corner pieces, and install the foot seats at the corresponding positions. Please note that when the middle column is connected with the middle diaphragm, the two corner brackets at the same position should be offset by 5mm from top to bottom to prevent the corner bracket screws from colliding. When installing the foot pedal, the foot pedal shall be placed on the floor first, and the distance between the foot pedal and the edge of the column plate shall be determined according to the width ratio of the column plate. Then install the entire footrest directly on the pillar panel, one for the side pillar panel and two for the middle pillar panel.
4.墙板上的角码和地板上的脚座都要安装。用冲击钻钻孔,钉膨胀胶塞,用4*30不锈钢平头自攻锁角码。注意角码的正确安装。上下对齐,间距均匀;对于脚座,我们需要用冲击钻在地板上钻孔,钉上膨胀橡胶塞,用4*30螺钉将脚座固定在地板上。
4. Corners on wallboard and footrest on floor shall be installed. Drill holes with percussion drill, nail expansion rubber plugs, and use 4 * 30 stainless steel flat head self tapping locking angle. Pay attention to the correct installation of corner code. Align up and down with even spacing; For the foot rest, we need to drill holes on the floor with an impact drill, nail an expansion rubber plug, and fix the foot rest on the floor with 4 * 30 screws.

济南卫生间隔断
5.将预装的中隔板和中栏板放好,看灯板和侧栏板是否到位,注意将中隔板一侧的垫块垫在墙上,使中隔板靠近墙壁,调整角度使中隔板正面两侧垂直。锁定方块代码并移除方块。使用相同的方法锁定参考板和侧柱,检查侧板和中间隔板是否在同一平面上。
5. Put the pre installed middle partition and middle fence in place to see if the light board and side fence are in place. Pay attention to pad the cushion block at one side of the middle partition on the wall to make the middle partition close to the wall. Adjust the angle to make the two sides of the front of the middle partition vertical. Lock the block code and remove the block. Use the same method to lock the reference plate and the side pillar, and check whether the side plate and the intermediate bulkhead are on the same plane.
6.在卫生间隔断上面安装压杆,将压杆扣在柱板和轻质板上,用电钻钻压杆孔,用M4*16不锈钢自攻螺钉锁紧压杆;测量门顶部和底部的内部空间距离偏差在0.5毫米以内;注意将中柱和侧柱调整到共面和垂直。
6. Install the pressure bar on the toilet partition, buckle the pressure bar on the column plate and light plate, drill the pressure bar hole with an electric drill, and lock the pressure bar with M4 * 16 stainless steel tapping screws; The internal space distance deviation between the top and bottom of the door shall be measured within 0.5mm; Pay attention to adjust the center pillar and side pillar to be coplanar and vertical.
7.将铰链安装到图纸要求的位置。安装门板铰链时,请注意从上到下150毫米的距离。
7. Install the hinge to the position required by the drawing. When installing the door panel hinge, pay attention to the distance of 150mm from top to bottom.
8.将组装好的门安装在隔板上,锁上门,并将把手安装在正确的位置。注意安装合页时,门与门之间的间隙需要检测在2-3.5毫米以内,单面缝的宽度误差为0.5毫米,相邻门之间的间隙均匀。安装锁定铰链时,请在安装锁定之前调整锁定和锁定之间的间隙。
8. Install the assembled door on the partition, lock the door, and install the handle in the correct position. Note that when installing hinges, the gap between doors shall be detected within 2-3.5mm, the width error of single side seam shall be 0.5mm, and the gap between adjacent doors shall be even. When installing the lock hinge, adjust the gap between the lock and the lock before installing the lock.
9.安装衣钩等配件,清洁检查,注意衣钩等配件的安装,完工后检查整个隔板是否有划痕、裂纹等缺陷,并用相应的油漆或彩色修复笔进行修复。修理完成后,清洁表面,清洁地板,并由其他客户接受。
9. Install the clothes hook and other accessories, clean and check, pay attention to the installation of the clothes hook and other accessories, and check the whole partition for scratches, cracks and other defects after completion, and repair with corresponding paint or color repair pen. After the repair, clean the surface, clean the floor and accept it by other customers.
10.其实其他安装方法和普通家具安装方法差不多,只是需要在墙上打孔。
10. In fact, other installation methods are similar to ordinary furniture installation methods, except that holes need to be punched on the wall.
在安装隔断的时候要选择合格的隔断材料,墙板上的角码和地板上的脚座都要安装,门板的铰链上下的距离要达到150毫米,不要太大也不要太少,不然很容易影响隔断门的开关。关注我们http://www.jnndjc.com了解更多相关事项!
When installing partitions, qualified partition materials shall be selected. Corner pieces on the wall panel and foot seats on the floor shall be installed. The distance between the upper and lower hinges of the door panel shall reach 150 mm, which shall not be too large or too small, otherwise it is easy to affect the opening and closing of the partition door. Follow us http://www.jnndjc.com Learn more!